Burst pipe? Blocked drain?07862 439631
No. 01Bathrooms · Towcester

Bathrooms in Towcester.
One trade. One quote. One handover.

Full bathroom transformation for Towcester homes (NN12). One trade managing the whole job — survey, design, strip, fit, sign-off. Period properties + commuter estates — newer combi and system boilers throughout. Fixed price written up front. Staged payments — never more than 30% upfront.

From £4,995 · staged payments

WhatsApp opens with a message. Send postcode + 2 photos. Vince replies with survey slots.

Bathroom installation in Towcester
01
WaterSafe
Approved
02
G3 Unvented
Building Regs
03
£2m
Public Liability
04
5.0★
Google reviews
No. 01aAfter you click

WhatsApp opens ready to send.

Send your postcode and two photos of the current bathroom. Vince replies with survey slots, then writes up a fixed quote within 24h of the visit.

Survey slots this week

Northampton + NN postcodes first. Morning and early-evening visits where available. Vince confirms the exact slot by WhatsApp.

No. 02What you get

Bathrooms for
Towcester homes.

Full bathroom renovations — tiles to taps, one trade managing the whole job. I sub-contract the tiling and electrics to people I've worked with for years, but the plumbing, project management and final sign-off is all me. Most installs are £4,995-£14,995 depending on room size and spec. Staged payments. Written contract before we start.

  • Detailed in-person survey + written quote (free)
  • Single point of contact — me, not three trades arguing
  • Spec list with you (suite, taps, tiles, lighting) before order
  • Skip + protection of the rest of the house during the strip-out
  • Staged payments — never more than 30% upfront
No. 03Before / After

Drag.
See the transformation.

Same-room finish examples. Slide the handle left and right to compare the kind of transformation to discuss at survey.

Walk-in shower install — after
Walk-in shower install — before
BeforeAfter
← Drag to compare →

Northampton

Walk-in shower install

Floor torn up, pipework dropped to the new tray waste, new tray and glass cubicle fitted, basin added. Bathroom turned around in under a week.

Family bathroom — finish example — after
Family bathroom — finish example — before
BeforeAfter
← Drag to compare →

Northampton

Family bathroom — finish example

Same-room before/after concept for a full strip + refit: marble-effect porcelain, freestanding bath, separate walk-in shower and brushed brass fittings. Use it as a visual brief for the survey.

No. 04What you can have

Four ways I do bathrooms in Towcester.

En-suite refresh

01

En-suite refresh

Like-for-like replacement of shower, toilet, basin + tiles. £4,995-£6,995, 5-7 working days.

Family bathroom full reno

02

Family bathroom full reno

Strip + refit including new pipework. £6,995-£11,995, 8-12 working days.

Wet room conversion

03

Wet room conversion

Specialist tanking, drainage, floor build-up. £8,995-£14,995, 10-14 working days.

Cloakroom WC

04

Cloakroom WC

Compact downstairs WC + basin. £2,995-£4,995, 3-5 days.

No. 05Recent finishes

Recent work.
And finish examples.

The walk-in shower is Vince’s real work. The labelled finish examples show styles you can use as a visual brief.

Compact shower room — finish example

En-suite

Compact shower room — finish example

Style direction example: light grey vertical wall tiles, frameless walk-in shower and a wooden floating shelf for a compact en-suite brief.

Master bathroom — finish example

Family bathroom

Master bathroom — finish example

Style direction example: double vanity, backlit round mirrors, brushed gold taps and large-format marble-effect porcelain.

Wet room — finish example

Wet room

Wet room — finish example

Style direction example: tanked floor, linear drain, slate-grey large-format wall tiles and a frameless glass screen.

Cloakroom WC — finish example

Cloakroom

Cloakroom WC — finish example

Style direction example: sage half-panelling, marble basin on a wooden floating shelf, brushed brass tap and herringbone floor tiles.

No. 05Everything included

One price.
No surprises.

Every quote includes everything below. No hidden labour rates. No surprise extras at week three.

Free in-home survey

Tape measure, sample boards, written quote within 24h. No obligation.

One trade, whole job

Plumbing, tiling and electrics — I coordinate it all. You speak to me, not three companies.

Trade discounts

10–25% off RRP at City Plumbing, Wickes, Tile Mountain — passed straight to your bill.

Skip + dust protection

Strip-out waste removed daily. Zip walls keep dust out of the rest of the house.

Local — I live in Northampton

Quick site visits, zero travel surcharge across NN postcodes. References on tap if you want to drive past a recent install.

Staged payments

20 / 30 / 30 / 20 — never more than 30% upfront. Written into the contract.

12-month workmanship guarantee

Plus 5–10 year manufacturer warranties on suite + sanitaryware. All in writing.

Building Regs notifications

GasSafe + LABC paperwork submitted on your behalf. Zero admin for you.

Fixed-price guarantee

The number I quote is the number you pay. If it overruns, that's on me.

My guarantee

Match-or-beat any like-for-like quote.

Find me a written quote from another WaterSafe + G3 Unvented plumber for the same spec, and I’ll match it AND knock off another £200. Show me within 14 days of my survey. No small print.

No. 06Pricing

Every price
written down.

Fixed price written up front·Staged payments, 20% deposit·No surprise extras

Sample pricing

Full price list
  • Cloakroom WC
    compact downstairs · 3-5 days
    £2,995–£4,995
  • En-suite refresh
    like-for-like · 5-7 days
    £4,995–£6,995
  • Family bathroom (full reno)
    strip + refit, new pipework · 8-12 days
    £6,995–£11,995
  • Wet room conversion
    tanking + drainage · 10-14 days
    £8,995–£14,995

The price I quote is the price you pay.

Ready for a real quote?

Send postcode + two photos. Vince replies with survey slots.

No form. No design appointment pressure. Just a quick WhatsApp thread, a home survey, then a fixed written quote.

Reviews

Real names. Real jobs.

5.0★★★★★
24 Google reviews
★★★★★

Finlays Plumbing have done a couple of jobs for me now (and a bathroom refurbishment in the pipeline). He will always be my go to plumber until he retires! This is because he really does go above and beyond on EVERY job. He takes the time to explain what needs to be done and why.

T
The Boss
Verified Google review
★★★★★

Vince rang me back shortly after I contacted him and we arranged for his visit the following day. I had several issues in both my bathroom and kitchen which Vince solved within a few hours. He kept me informed of his progress throughout his work.

P
Peter Dunkley
Verified Google review
★★★★★

I recently moved into a property that had no shower, with a family of 5 and a child with skin condition. Vince was the first person to respond within minutes. He was polite, professional, explained pros and cons, and gave me a price straight away. Done to perfection.

L
Lubna Khan
Verified Google review

See all 24 reviews on Google

No. 07Questions

Asked & answered.

01How long does a bathroom install actually take?

Cloakroom WC: 3-5 working days. En-suite refresh: 5-7 days. Full family bathroom: 8-12 days. Wet room conversion: 10-14 days. Quoted exactly during the survey, written into the contract — if I overrun, I cover the daily rate on alternative bathroom access.

02Can I still use my bathroom while it's being done?

If you have a second bathroom, yes — I work clean and contain dust with zip walls. If this is your only bathroom, I plan the rip-out so you're without it for the shortest possible time (usually 2-4 days mid-project, never overnight without warning). Exact days mapped during the survey.

03Do you supply the suite, taps and tiles, or do I?

Either way works. I have trade accounts at City Plumbing, Wickes and Tile Mountain (10-25% off RRP) and pass the discount straight to your bill. Or you spec your own and I install it. The survey covers both options with line-by-line prices.

04What's the deposit and payment schedule?

20% on confirmation, 30% the day before strip-out, 30% mid-project, 20% on final sign-off. Never more than 30% upfront. Written into the contract before any work begins.

05Is there a warranty on the work?

12-month workmanship guarantee on everything I install — taps, valves, pipework, drainage, tiling. Manufacturer warranties pass through on suites and sanitaryware (typically 5-10 years). All in writing, emailed before I leave.

06What if I want to change something mid-project?

Spec changes happen. If you want to swap a tile, change the tap finish, add a heated towel rail mid-project — write it on a Post-it, stick it on the wall. I'll quote the change in writing within the working day. No 'we'll just sort it on the day' surprises.

Ready to start?

Your bathroom.
Done right.

Free in-home survey within 5 working days. Written quote within 24h. Fixed price, staged payments. One trade, one quote, one handover.

07862 439631WhatsApp